OLAER FAWCETT CHRISTIE
About usContact Us

The Olaer Group Worldwide

The Olaer Group Worldwide

Our Main Partners

Our Main Partners

 

AIR/OIL COOLER INSTALLATION
and service instructions

A. Mineral compatibility with SQ Aluminium matrix

• Mineral oil HL/HLP, DIN 51524
• Oil/Water emulsion HFA, HFB, CETOP RP, 77H
• Water glycol HFC, CETOP RP 77H
• Phosphate ester HFD-R, CETOP RP 77H

SQ Material

• Matrix : Aluminium (std) or steel
• Fan blades : Fibre-glass reinforced polypropylene
• Fan housing : Steel
• Guard : Steel
• Electrical motor, Aluminium (std)
• Other parts : Steel, electronic blast coated with epoxy plastic powder.

B. Technical specifications for SQ cooler matrix

• Dynamic working pressure 14 bar. Tested with 5 million pressure cycles at 3 Hz, temperature 50ºC.
• Maximum static pressure 21 bar
• Temperature shock tested with steam 104ºC and water 13ºC.
• Heat transfer tolerance 6%
• Maximum oil inlet temperature 120ºC. High temperatures cause reduction in pressure rating. Please contact OLAER.
• Higher viscosities than 100 Cst cause reduction in cooling capacity. Please contact OLAER.
• Coating : protective diffused zinc coating over the entire surface.
• Environment : for corrosive environment, contact OLAER for suitability.

C. Technical specifications for electrical motors

SQI Air/OIl coolers are using 3-phase asynchronous motors according to the requirements of IEC 34-1 and IEC 72, complying with DIN42950/DIN42973.
• Standard operating voltages : Nominal voltage 230/400V, D/Y motors are stamped for 50Hz: 220-240/380-420V 5%. Other voltages, frequencies and single phase motors are available on request.
• Insulation : Class F
• Temperature rise : Class B
• Maximum operating conditions : Ambient temperature 50ºC, altitude 1000 meters above mean level. For extreme conditions, contact your nearest OLAER company.
• Protection standard : IP55. Higher protections standards available on request.
• Modifications: offshore versions and hazardous duty type motors are available on request.

 

 

D. Installation instructions

The very rigid cooler construction permits both face and foot mounting. When face mounted in front of a ducting or ventilation shaft, please use the 4 mounting holes located on the U channels of the matrix.

Place the cooler so that there is an unrestricted airflow to and from the cooler. The distance from the nearest wall should not be less than half the diameter of the fan.

E. Servicing instructions

For cleaning the internals of the matrix, connect the cooler to a closed circuit and circulate perchlorethylene. After cleaning the radiator should be flushed with oil before being reconnected to the hydraulic system.

Cleaning of air fins

The easiest way to clean the air fins is using compressed air or rinsing with water. Fouling can be dealt with using a degreasing agent and a high-pressure washing system. When using a high-pressure washing system point the jet carefully parallel to the air fins at a distance no closer than 3 cm away from the fins.

 

Top of page